Laserfiche WebLink
Capital Equipment <br />H <br />U <br />• O <br />Project Name Engineering Plotter Replacement <br />Capital Equipment <br />3-Existing Obligation (Med) <br />Status Active <br />Total Cost $10,000 <br />Description <br />a) <br />0 <br />0 <br />in order to send or re <br />C <br />0 <br />U <br />0 <br />a) <br />W <br />a) <br />a) <br />0 <br />'O <br />ct <br />bf <br />C <br />0 <br />C <br />U <br />d scanner use <br />cc <br />a) <br />The Engineering plotter is a large fi <br />Justification <br />cu <br />0 <br />0 <br />0 <br />a) <br />0 <br />0 <br />U <br />a) <br />to evaluate t <br />a) <br />ent has been sche <br />a) <br />U <br />R <br />a) <br />a) <br />0 <br />H <br />is around 10 yea <br />y <br />01) <br />O 00 <br />O <br />_0 0 <br />4-a � <br />O U <br />a) <br />aa) <br />a) <br />a <br />• O <br />a) <br />a) <br />M O <br />) <br />N <br />0 <br />U O <br />s • G <br />O <br />3 0 <br />a) <br />¢. 0 <br />• a <br />o <br />a) -0 <br />00 a) <br />W 0 <br />a) <br />▪ E <br />H <br />N <br />N <br />N <br />N <br />00 <br />0) <br />0)Smo <br />Furnishings/Equipment <br />H <br />M <br />N <br />0' <br />00 <br />Funding Sources <br />General Fund <br />