Laserfiche WebLink
Capital Equipment <br />Project Name Public Works Utilities Switch <br />Capital Equipment <br />3-Existing Obligation (Med) <br />Status Active <br />Total Cost $7,000 <br />Description <br />0 <br />a) <br />U <br />a) <br />C) <br />0 <br />orking switch is responsible for n <br />a) <br />z <br />Justification <br />a) <br />a) <br />al) <br />0 <br />0 <br />a) <br />a) <br />a) <br />a) <br />E. <br />H <br />.5 <br />a) <br />0 <br />The equipment has exceeded its expecte <br />N <br />00 <br />Furnishings/Equipment <br />H <br />00 <br />Funding Sources <br />General Fund <br />H <br />