Laserfiche WebLink
Capital Equipment <br />Eqpt Replacement <br />Category Capital Equipment <br />Priority 1-Existing Obligation (High) <br />Status Active <br />Total Cost $211,000 <br />Description <br />DATE ACQUIRED: 1/20/04 <br />#642: 2004 Elgin Sweepe <br />Justification <br />a) <br />a) <br />a) <br />0 <br />0 <br />H <br />N <br />N <br />00 <br />• <br />Sao <br />Furnishings/Equipment <br />N <br />H <br />H <br />N <br />00 <br />Funding Sources <br />Storm Water Utility Fund <br />N <br />H <br />