Laserfiche WebLink
Capital Equipment <br />Eqpt Replacement <br />• <br />d) <br />0 <br />U <br />03 <br />a) <br />-o <br />• <br />LC a) <br />� <br />0 <br />z <br />U U <br />N N <br />O O <br />P. a <br />Capital Equipment <br />0 <br />U <br />3-Existing Obligation (Med) <br />Status Active <br />Total Cost $97,000 <br />e #655: 2006 ut <br />Description <br />Justification <br />emoval on side <br />This piece of equipment is used for sno <br />Unit 655 will be 14 years old by 2020. Normally start to consider replacement around 10-12 years for this type of equipment. Its 2016 Point Replacement Value is 26 see below: <br />Condition I <br />Under 18 Points <br />0 <br />O <br />N <br />E ,N <br />N <br />0 <br />Y <br />O 0 <br />0 <br />• E <br />0 • N <br />w_ <br />V O 0 N <br />WLaz <br />O 0 <br />O O <br />ra <br />'o 'o <br />O O <br />U <br />N N <br />O O <br />0o m <br />- N <br />Condition IV <br />28 Points Plus <br />O <br />O <br />773 <br />O O <br />N- A <br />— a, o r--� <br />04 <br />VD <br />N N <br />O O <br />N N <br />V1 V1 <br />N N <br />O O <br />N N <br />M M <br />N N <br />O O <br />N N <br />N N <br />N N <br />O O <br />N N <br />00 00 <br />O O <br />N N <br />Furnishings/Equipment <br />Funding Sources <br />0 <br />O) <br />General Fund <br />a▪ ) <br />A <br />01 <br />1 <br />0 <br />