Laserfiche WebLink
Street Improvements <br />Street Improvement <br />3-Existing Obligation (Med) <br />G' bA p <br />O a) <br />L) Cc./ <br />P <br />3 <br />17-STR-004 <br />0 <br />Total Cost $347,000 <br />Description <br />0 <br />O <br />0 <br />O <br />'O <br />M <br />'O <br />O <br />-0 <br />0 <br />0 <br />vi <br />a) o <br />� N <br />0 <br />o <br />o-0 <br />i <br />0 <br />E <br />0 <br />0 <br />od <br />O <br />�0 <br />00 <br />Total Project Costs: $347,000 <br />O <br />O <br />O <br />r O <br />Justification <br />a) <br />0 <br />a) <br />0 <br />U <br />0 <br />0 <br />0 <br />0 <br />-0 <br />0 <br />a) <br />uction at t <br />cluding recons <br />ularly scheduled basis <br />a) <br />ad <br />0. <br />O <br />0 <br />0 <br />a) <br />0 <br />a) <br />0 <br />0 <br />a) <br />0 <br />U, -0 <br />0 to <br />'0 0 <br />a) <br />a) c <br />U � <br />• E <br />sz. <br />0 <br />0 0 <br />sU, <br />O <br />0 0 <br />0_ <br />U ct <br />W � <br />Look at Possibility of Using MSA or PIR funds for portion of costs instead of bonding. <br />O o <br />O O <br />0' <br />."8 <br />O CD C.,Q <br />H <br />N N <br />O O <br />VD <br />O O <br />N N <br />V') V7 <br />N N <br />O <br />N N <br />•71- <br />N N <br />N N <br />M M <br />N N <br />O <br />N N <br />N N <br />N N <br />O O <br />N N <br />0 0 <br />0 0 <br />N A N <br />O r) M O <br />O O <br />N N <br />O O <br />N N <br />00 OD <br />• <br />'C <br />Funding Sources <br />) o 0) <br />f� O N <br />CO N <br />Storm Water Utility Fund <br />