Laserfiche WebLink
Street Improvements <br />Street Improvement <br />3-Existing Obligation (Med) <br />G' bA p <br />Aj <br />vi <br />L) o. Cc./ <br />P <br />3 <br />17-STR-008 <br />a) <br />0 <br />Project Name <br />Total Cost $797,000 <br />Description <br />Justification <br />eluding recons <br />ularly scheduled basis <br />a) <br />C <br />O <br />a) <br />U <br />0 <br />a) <br />a) <br />0 <br />a) <br />a) <br />a) <br />a) <br />O to <br />-C <br />0 <br />a) <br />d O <br />a) <br />U• <br />E <br />- O <br />0 S <br />a) y <br />sue, <br />0 0 <br />-0 -0 <br />O a) <br />p <br />U <br />W � <br />Look at Possibility of Using MSA or PIR funds for portion of costs instead of bonding. <br />H <br />VD <br />•71- <br />N <br />N <br />N <br />00 <br />a) <br />O <br />H <br />H <br />N <br />N <br />N <br />N <br />00 <br />N <br />Funding Sources <br />N <br />O) <br />LO <br />C <br />co <br />E O O <br />En ct <br />H <br />a) 0) <br />En En c <br />—0 � <br />(0 O O C <br />00 <br />N� is <br />(O to Obi <br />