Laserfiche WebLink
Street Improvements <br />H <br />U <br />• O <br />Project Name Reconstruction Streets -Alpine Drive <br />Oblig <br />Total Cost $2,830,000 <br />Description <br />0 <br />O <br />00 <br />0 <br />0 <br />00 <br />Reconstruction of Alpine Drive between Pu <br />00 <br />M <br />�s <br />° <br />r <br />0 <br />Justification <br />a) <br />O <br />which is esti <br />uction at the end of i <br />cluding recons <br />e maintenance on a regularly scheduled basis <br />a) <br />a) <br />'� vi <br />U, -0 <br />O di) <br />-a a <br />a) <br />-0 0 <br />a)ca <br />U � <br />0 -O <br />C <br />N Y <br />sU, <br />O <br />tea) -0 <br />U <br />(0 <br />EES <br />>, <br />Look at Possibility of Using MSA or PIR funds for portion of costs instead of bonding. <br />H <br />V'1 <br />N <br />N <br />•71- <br />00 <br />N <br />CO <br />N <br />s <br />H <br />H <br />N <br />N <br />N <br />00 <br />Funding Sources <br />O O O <br />LO O (N <br />f� O N <br />CO- M O <br />COMN 6) <br />O O O <br />0) O LC) <br />f-- O N <br />CO- M O <br />M CO <br />CO N 6) <br />Storm Water Utility Fund <br />