Laserfiche WebLink
Appendix A <br />Bolton & Menk Public Infrastructure Study: Section VII, Cost Considerations <br />2018 Cost Estimations by Road Segment <br />ImprovFement <br />Roadway <br />Trails/Sidewalks <br />Street Lighting <br />Storm Sewer <br />Trunk Storm Sewer <br />Watennain <br />Sanitary Sewer <br />Trunk San Sewer <br />Total Costs <br />Segment A-1 <br />$ 361,000 <br />$ 32,000 <br />$ 22,000 <br />$ 118,000 <br />$ 43,000 <br />$ 122,000 <br />$ 78,000 <br />$ 0 <br />$ 776,000 <br />Prepared by: Bolton & Meat, Inc. <br />Center Street Area Analysis! R16.114929 <br />Segment B <br />$ 150,000 <br />$ 35,000 <br />$ 13,000 <br />$ 35,000 <br />$ 0 <br />$ 57,000 <br />$ 0 <br />$ 0 <br />$ 290,000 <br />Page 5 of 6 <br />Segment C-1 <br />$ 171,000 <br />$ 75,000 <br />$ 17,000 <br />$ 43,000 <br />0 <br />$ 98,000 <br />$ 77,000 <br />$ 0 <br />$ 481,000 <br />Segment C-2 <br />$ 67,000 <br />$ 30,000 <br />$ 7,000 <br />$ 17,000 <br />$ 0 <br />$ 3 8, 000 <br />$ 31,000 <br />$ 0 <br />$ 190,000 <br />