My WebLink
|
Help
|
About
|
Sign Out
Home
01/11/18
Ramsey
>
Economic Development Authority
>
Full Agendas
>
2010's
>
2018
>
01/11/18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2022 4:12:29 PM
Creation date
1/16/2018 3:34:00 PM
Metadata
Fields
Template:
Full Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A <br />Bolton & Menk Public Infrastructure Study: Section VII, Cost Considerations <br />2018 Cost Estimations by Road Segment <br />ImprovFement <br />Roadway <br />Trails/Sidewalks <br />Street Lighting <br />Storm Sewer <br />Trunk Storm Sewer <br />Watennain <br />Sanitary Sewer <br />Trunk San Sewer <br />Total Costs <br />Segment A-1 <br />$ 361,000 <br />$ 32,000 <br />$ 22,000 <br />$ 118,000 <br />$ 43,000 <br />$ 122,000 <br />$ 78,000 <br />$ 0 <br />$ 776,000 <br />Prepared by: Bolton & Meat, Inc. <br />Center Street Area Analysis! R16.114929 <br />Segment B <br />$ 150,000 <br />$ 35,000 <br />$ 13,000 <br />$ 35,000 <br />$ 0 <br />$ 57,000 <br />$ 0 <br />$ 0 <br />$ 290,000 <br />Page 5 of 6 <br />Segment C-1 <br />$ 171,000 <br />$ 75,000 <br />$ 17,000 <br />$ 43,000 <br />0 <br />$ 98,000 <br />$ 77,000 <br />$ 0 <br />$ 481,000 <br />Segment C-2 <br />$ 67,000 <br />$ 30,000 <br />$ 7,000 <br />$ 17,000 <br />$ 0 <br />$ 3 8, 000 <br />$ 31,000 <br />$ 0 <br />$ 190,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.