Laserfiche WebLink
EXECUTIVE SUMMARY <br />The Ramsey City Council and Ramsey Economic Development Authority (EDA) have identified the need <br />to prepare for further development of the COR. The City has identified an area of publicly owned land <br />located west of Center Street NW for a potential apartment complex and City park. The area is generally <br />located north of Sunwood Drive NW, east of Xenolith Street NW, South of Ramsey Parkway and west of <br />Center Street NW. <br />This analysis included examining the feasibility of constructing the required supporting public <br />infrastructure, and developing preliminary design layout plans in this area of the COR. <br />A portion of the public improvements adjacent to the area were completed in 2004 along Sunwood Drive <br />NW and in 2014 along Center Street NW. The street and utility improvements completed include <br />construction of a 30-inch trunk sanitary sewer main in Sunwood Drive, an extension of 12-inch sanitary <br />sewer in Center Street, and an extension of 12-inch watermain in Center Street. <br />Future improvements required to serve the study area include: <br />• Construction of Ramsey Parkway west from Center Street NW to Xenolith Street NW, <br />• Construction of Ramsey Parkway west from Xenolith Street NW to Zeolite Street, <br />• Expansion of Center Street NW north to Ramsey Parkway, <br />• Construction of Xenolith Street NW, <br />• Construction of Yolite Street NW between Ramsey Parkway and Sunwood Drive, <br />• Extension of an 8-inch sanitary sewer line along Xenolith Street NW, <br />• Looping an 8-inch water main along Xenolith Street and Ramsey Parkway, <br />• Relocation of a 15-inch trunk sanitary sewer line along Ramsey Parkway, <br />• Use of a regional rate control basin to maintain existing storm water flow rates in the COR, <br />• Construction of a 30-inch regional pond outlet pipe along Yolite Street NW, <br />• Installation of street lighting, trails/sidewalks, and landscaping consistent with City Policy, and <br />• Obtaining of ROW required for improvements during the platting process. <br />The total for the roadway, trail, sidewalk, street lighting, lateral sanitary sewer and water main <br />improvements is estimated at $3,652,000. <br />The total trunk related improvements for sanitary sewer and storm sewer is estimated at $215,000. <br />The total landscaping improvements along Sunwood Drive from Zeolite Street to Sapphire Lane is <br />estimated at $691,000. <br />The costs are considered project costs and include 30% contingencies and project development costs <br />(administrative, engineering, and fiscal). <br />The information presented in this report is intended to allow for discussions with property owners and <br />developers, as well as allow the City to begin considering funding options <br />Prepared by: Bolton & Menk, Inc. EXECUTIVE SUMMARY <br />Center Street Area Analysis I R16.114929 <br />