Laserfiche WebLink
I. INTRODUCTION <br />The Ramsey City Council and Ramsey Economic Development Authority (EDA) have identified the need <br />to prepare for further development of the COR. The City has identified an area of publicly owned green <br />space located west of Center Street NW for a potential apartment complex and City park. Appendix A <br />includes the COR Development Plan 6.0 (05.15.2012). Appendix B includes figures referenced <br />throughout this study, Figure 1 depicts the general location of the study area associated with this analysis. <br />Figure 2 depicts the individual street segments analyzed. <br />The Center Street study area is one component (approximately 22 acres) of a larger green -field area ready <br />for development (approximately 87 acres). The larger area includes property designated for traditional <br />retail/commercial development, along with high -density residential uses. The City anticipates a portion of <br />the Center Street study area to be developed into a City park area (See Figure 3). <br />The primary roadway system serving this area of the COR is Bunker Lake Boulevard to the north and <br />Sunwood Drive NW to the south. This analysis includes examining the feasibility of constructing <br />supporting public infrastructure in, and adjacent to, the study area. <br />II. STUDY CONTENT <br />The purpose of this analysis is to determine the necessary public infrastructure and associated costs <br />required to allow land within the study area to develop. Roadways included in the study are as follows: <br />• Ramsey Parkway from Center Street NW to Zeolite Street NW, <br />• Center Street NW from the existing developed section north to Ramsey Parkway, <br />• Xenolith Street NW from Sunwood Drive to Ramsey Parkway, and <br />• Yolite Street NW from Sunwood Drive to Ramsey Parkway. <br />Figure 2 in Appendix B depicts the roadway segments included in this analysis. <br />Our analysis consists of four separate components that, when combined, provide an overview of the study <br />area needs: <br />• Preliminary Design Layout — Provides a graphical depiction of the public roadways and <br />utilities, <br />• Regional Storm Water Analysis — Defines conceptual storm water ponding needs and building <br />pad elevations, <br />• Preliminary Project Cost Estimates — Provides a baseline for fiscal planning of the <br />improvements, and <br />• Final Report — Describes required infrastructure improvements, layouts and costs. <br />III. BASE DATA AND GUIDANCE <br />Prior to initiating the study, the City of Ramsey provided record drawings, plan drawings and GIS <br />information for use in creating an existing infrastructure base map. Additionally, the following <br />information and guidance was given by the City for completing the study. <br />Prepared by: Bolton & Menk, Inc. <br />Center Street Area Analysis' R16.114929 <br />INTRODUCTION <br />Page 1 <br />