Laserfiche WebLink
Landscaping <br />The base project includes a very utilitarian approach to landscaping for the area. Bituminous trails and <br />lighting were included, but other features, such as trees, shrubs, decorative features and monuments are <br />not included in the estimated project costs. The exception to this is Sunwood Drive NW, where the <br />boulevard costs include continuing the landscaping along the north side of Sunwood Drive as it exists east <br />of Sapphire Street. <br />An alternative was also reviewed in the Ramsey Parkway median. A bio-retention basin was considered <br />along the entire median to provide pre-treatment to the storm water prior to discharging into the regional <br />pond. The base cost for Ramsey Parkway includes a 10-foot bituminous trail in the median with an <br />alternative cost calculated for the cost difference between the two median options. <br />Right of Way and Easements <br />Locations of right of way needs are depicted on the figures based on roadway and trail sections. The exact <br />areas will need to be determined during the platting process. We assumed that the right of ways would be <br />dedicated as a portion of the development process and no costs are included in the project costs for <br />acquisitions. Vacation of the existing platted right of ways that are no longer needed are also not included <br />in the project costs. <br />Anoka County Regional Trail <br />The Central Anoka County Regional Trail follows Bunker Lake Boulevard, and currently terminates at <br />Ramsey Boulevard. The trail had been proposed to follow Ramsey Boulevard to the south, crossing TH <br />10 and connecting to the Anoka County's Mississippi West Regional Park. A new alignment is now being <br />proposed, which ultimately takes advantage of the proposed Mississippi Skyway for crossing TH 10. The <br />new alignment follows Bunker Lake Boulevard further to the west, before turning south at Center Street. <br />The trail then follows Center Street through much of the COR, connecting to the transit station on the <br />north side of TH 10. <br />Timing of Improvements <br />While the improvements discussed and depicted in the figures will be required to support the area, timing <br />of the improvements will most likely be dependent upon each proposed development. <br />As individual developments are considered, the public infrastructure will need to be reviewed and <br />determinations made as to its adequacy to serve the properties. As upgrades, extensions and <br />improvements are determined to be necessary, funding strategies will need to be developed which may <br />include full or partial assessments to benefitting properties. <br />VII. COST CONSIDERATIONS <br />Costs estimates were developed for each improvement type. These estimates are based on past bid pricing <br />and similar projects completed previously. The segments are depicted on Figure 2 in Appendix B. All <br />costs presented in the following pages are 2018 costs. <br />Prepared by: Bolton & Menk, Inc. COST CONSIDERATIONS <br />Center Street Area Analysis' R16.114929 Page 8 <br />