My WebLink
|
Help
|
About
|
Sign Out
Home
01/11/18
Ramsey
>
Economic Development Authority
>
Full Agendas
>
2010's
>
2018
>
01/11/18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2022 4:12:29 PM
Creation date
1/16/2018 3:34:00 PM
Metadata
Fields
Template:
Full Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
would be constructed through the public process: <br />• Roadways, including storm water conveyance systems, <br />• Water System Facilities, <br />• Sanitary Sewer Facilities, <br />• Trails, <br />• Street Lighting, and <br />• City Parks <br />While the street lights will most likely be installed by a private utility and the trails could potentially be <br />constructed by the property owner, we have included these items as public improvements. <br />Other improvements were considered secondary and are typically the property owner's responsibility: <br />• Sanitary Sewer Service Extensions, <br />• Water Service Extensions, <br />• Natural Gas Lines to Buildings, <br />• Telephone Service to Buildings, <br />• Electric Service to Buildings, <br />• Site Grading, <br />• Site Landscaping, <br />• Site Storm Water Conveyance, and <br />• Easement Dedication. <br />These types of improvements are typically inspected by the City for conformity with applicable codes and <br />standards, but are constructed by the property owner. <br />Prepared by: Bolton & Menk, Inc. COST ALLOCATION ALTERNATIVES <br />Center Street Area Analysis I R16.114929 Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.