Laserfiche WebLink
BID SC~ "D" - STREET CONST~JCTION - SUNFISH LAKE BLVD. <br />S.A.P. 199-113-01 <br /> <br />Est. QUant. <br /> <br />.W. <br /> <br /> Used <br /> to Date <br /> <br />U~t ~ice <br /> <br />Extension <br /> <br />1. 2104.501 C~.~on Excavation 1700 CY <br />2. 2112.501 Subgrade Preparation 5.3 RS <br />3. 2211.501 Aggregate Base, CL5 900 T <br />4. 2331.504 Bit. Material for Mix. 35 T <br />5. 2331.514 Base Course Mixttlre 300 T <br />6. 2341.508 Wearing Course Mixture 240 T <br />7. 2357. 502 Bit. Mat. for Tack Coat 130 GAL <br />8. 2506.522 Adj. Frame & Ring Casting 2 EA <br />9. 2531.501 B618 Conc. Curb & Gutter 1250 LF <br />!0. 2575.501 Roadside Seeding 0.5 AC <br />11. 2575.502 Seed Mixtn/re 5 40 LB <br />12. 2575.511 Mulch Material, Type I 1 T <br />!3. 2575.511 C~m~. Fert. 20-10-10 0.1 T <br />14. Spec. Centerline Pave. Marking 540 LF <br />15. Spec. Edge of Travel Ln. Marking 1300 LF <br />t6. 2105.535 Place Topsoil fr~m Stockpile 230 CY <br />17. 2575.505 Sodding 350 SY <br /> <br />TOTAL BID S~EIX]LE "D" - ~ CONSTRUCTION: <br /> <br />TOT3.T, BID SC~ "A": <br />!OTAL BiD S~7~E "B": <br />TOT~.T. BID S~E "C": <br />IQ/AL BID S~7~E "D": <br /> <br />IQTAL <br />r~_ESS 5% P~-TA~GE <br />.'-P-qS PAY ESTLU3fFE NO. <br /> <br />1: <br /> <br />;~ Pg~ PAR/~--AL PA~ OF: <br /> <br />Please veri~y the amount of previous payments, <br /> <br />1300 /CY <br /> 3/~ <br /> 445 /T <br /> 0/T <br /> 0/T <br /> 0/T <br /> 0 /GA <br /> <br /> S95 /~F <br /> o /AC <br /> 0 /LB <br /> 0/T <br /> 0'/T <br /> 0 /LF <br /> 0 <br /> 0 /CY <br /> 0 /SY <br /> <br />if ~ny, prior to making <br /> <br /> So.so <br /> $75.00 /TS <br /> $4. oo /T <br />$15~. 5O /T <br /> $9.50 /T <br /> $~1.10 /T <br /> $0.95 /GXL <br />$120.00 <br /> $3.90/L~ <br />$350. oo /~c <br /> $2.50 /LB <br />$350. oo /T <br />$300.00 /T <br /> S0. ~5 <br /> $0.15 <br /> SO.SO <br /> $2.00 /SY <br /> <br />$1,040.00 <br /> $225.00 <br />$1,780.00 <br /> $o.oo <br /> $o.oo <br /> So. oo <br /> $o. oo <br /> $o. oo <br />$3,490.50 <br /> So. oo <br /> $o. oo <br /> $o,oo <br /> $o. oo <br /> So. oo <br /> $o,oo <br /> $o, oo <br /> So. oo <br /> <br />$6,535.50 <br /> <br />$91,746.00 <br />$116,872.70 <br />$43,640.00 <br />$6,535.50 <br /> <br />$258,794.20 <br /> $12,939.71 <br /> $88,911.45 <br /> <br />$156,943.04 <br /> <br /> <br />