Laserfiche WebLink
CHANGE ORDER NO. 1 <br /> TO <br /> CONSTRUCTION WORK FOR <br />IMPROVEMENT PROJECT 88-9 <br />FRONT STREET STORM SEWER AND STREET <br /> CITY OF RAMSEY, MINNESOTA <br /> <br />October 19, 1988 Hakanson Anderson Associates, Inc. <br />********************************************************************* <br /> <br />The City has decided to make the following change to the contract for <br />this project. <br /> <br />Bid Schedule "A" Storm Sewer Front Street (S.A.P. 199-108-02) <br /> <br />Item <br /> <br /> Increase in <br />Contract Price <br /> <br />1. Furnish & install 150 tons of Class B <br /> pipe bedding at $9.00 per ton <br /> <br />$1,350.00 <br /> <br />Bid Schedule "B" Street ConstruCtion Front Street (S.A.P. <br /> <br />199-108-02) <br /> <br />2. Furnish & install 50 linear feet of <br /> concrete valley gutter at $13.50/LF <br /> <br />$ 675.00 <br /> <br />3. Furnish & install two triangular valley <br /> gutter sections at $490.00 each. <br /> <br />$ 980.00 <br /> <br />4. Furnish & install 100 linear feet of <br /> four feet wide concrete driveway aprons <br /> at $!7.50/LF <br /> <br />$1~750.00 <br /> <br />Total increase in Contract Price: <br /> <br />$4,755.00 <br /> <br />Description and Location of Work: <br /> <br />The proposed changes are needed for the completion of the street <br />and ~ ~ <br /> s~c_m sewer on Front Street. Class B bedding for the storm <br />sewer construction adjacent to Mississippi River. A valley <br />gutter and two concrete triangular valley gutter sections are <br />required for drainage at Feldspar Street. Concrete driveway <br />aprons, are ~_eqlu_~e~ ' to match the existing concrete driveways. <br />Ail work shall be done in accordance with the contract documents <br />or as directed by the engineer. <br /> <br /> <br />