Laserfiche WebLink
2018 Seal Coat and Crack Seal Improvements Project <br />Costs Summary <br />Area Map <br />Total Miles <br />Total Cost <br />A <br />5.25 <br />$ 127,784.06 <br />B <br />0.22 <br />$ 1,146.45 <br />C <br />6.54 <br />$ 158,182.36 <br />D <br />5.99 <br />$ 154,506.09 <br />E <br />1.16 <br />$ 46,585.57 <br />F <br />3.55 <br />$ 134,965.15 <br />Project Total <br />22.71 <br />$ 623,169.69 <br />2018 Seal Coat and Crack Seal Preliminary Estimate <br />Bid Type <br />Total Miles <br />Total Cost <br />BASE AREA <br />18.64 <br />$ 447,330.63 <br />ALT 1 <br />(HIGHLANDS 1ST - 4TH) <br />1.61 <br />$ 69,725.50 <br />ALT 2 <br />(SUNWOOD DRIVE / SUNNY <br />PONDS / RAMSEY <br />COMMONS 2ND / SECTION <br />24 UNPLATTED) <br />1.30 <br />$ 59,527.99 <br />ALT 3 <br />(THE PONDS OF RAMSEY) <br />1.16 <br />$ 46,585.57 <br />PROJECT TOTAL <br />22.71 <br />$ 623,169.69 <br />Note: ALT 1 & ALT 2 are located in Map Area D. ALT 3 is located in Map Area <br />E. <br />