Laserfiche WebLink
DOCUMENT 00 52 00 <br />STANDARD FORM OF AGREEMENT <br />THIS AGREEMENT is by and between City of Ramsey ("Owner") and Sauter & Sons, Inc ("Contractor"). Owner and <br />Contractor hereby agree as follows: <br />ARTICLE 1— WORK <br />1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally <br />described as follows: <br />Demolition of convenience store/gas station, hauling and placing Class 5 surfacing, and associated sediment <br />control and traffic control. <br />ARTICLE 2 — THE PROJECT <br />2.01 The Project, of which the Work under the Contract Documents is a part, is generally described as follows: <br />Sunfish Lake Gas Station Demolition. <br />ARTICLE 3 — ENGINEER <br />3.01 The Project has been designed by Hakanson Anderson. <br />3.02 The Owner has retained Hakanson Anderson ("Engineer") to act as Owner's representative, assume all duties and <br />responsibilities, and have the rights and authority assigned to Engineer in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 — CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment <br />as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Contract Times: Dates <br />A. Demolition and removal of building and all of its components, demolition and removal of canopy, demolition <br />and removal of signs and foundations. All Work including Bituminous Pavement Removal, Concrete Removal, <br />Removals, Grading, Construction of Aggregate Surfacing, Erosion Control and Restoration will be substantially <br />completed on or before November 22, 2017, and completed and ready for final payment in accordance with <br />Paragraph 15.06 of the General Conditions on or before November 22, 2017. <br />4.03 Liquidated Damages <br />A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that <br />Owner will suffer financial and other losses if the Work is not completed and Milestones not achieved within <br />the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with the <br />Standard Form of Agreement <br />00 52 00-1 <br />