Laserfiche WebLink
Capital.' Improvement Pro~a~m <br />CiT' of Ramsey, MiPmesota <br /> <br />2005 ,,.,,?,-~, 2009 <br /> <br />Proiect ~ <br /> <br />04-WTR-015 <br /> <br />South Highway 10 Frontage Road <br /> <br />} Description <br /> <br />Type <br />Useful Igil'e <br />Categocy <br />Priorihv <br /> <br />Water UtiiiU, <br /> <br />50 Years <br /> <br />Water Utiii~, improvemem <br /> <br />n;a <br /> <br />'FomlProje¢~Cost S?8,fl00 <br /> <br />[This project would consis~ of 1,000 lineal t%et of watermain and boring under l-Iighway i0, and a watermain loop <br />jprov~dea ~or reside~xs south of Higi~way I0. <br /> <br />Total ~roieci costs including land. street, sewer, water and storm sewer = $723,280. <br /> <br /> Justification <br /> <br />l\Vater improvements that would be required to encourage optimal development and redevelopment within the area. <br />A=umona ~v. the residents east of Tungsten (as well as the new deveopment) would be ona dead end line. The looping <br /> ~ ~t ~y providing a more continuous flow of water and betxer fire <br />,o~ me warermain would benefit tiaese individuals ~ ' <br /> rotecrion. <br /> <br />Expenditures 2005 2006 2007 2008 2009 Total <br />au~ine '~osbConsrruc:',on 78.000 78,000 <br /> Total 78.000 78,000 <br /> <br />Funding Sources 2005 2006 200? 2008 2009 Total <br /> <br />Water Utiiitv --uric 78.000 78.000 <br /> <br />TotaJ 78.000 <br /> <br />78,000 <br /> <br />176 <br /> <br /> <br />