My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 01/04/2018
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2018
>
Agenda - Planning Commission - 01/04/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:29:58 AM
Creation date
1/25/2018 9:11:03 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
01/04/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: Ramsey Elementary <br />Comprehensive Plan Amendment, Zoning Amendment and Site Plan Review: <br />December 21, 2017 <br />Page 3 of 3 <br />studied include the intersection of 167`h Avenue NW and Nowthen Boulevard in addition to <br />170`h Avenue and Nowthen Boulevard. <br />Surfacing: As required, all parking areas, loading areas, and drive aisles are proposed to be <br />surfaced with bituminous which is an acceptable material within the B-1 General Business <br />District. <br />Lighting: Any lighting used to illuminate off-street parking area, sign or structure, shall be <br />arranged to deflect light away from an adjoining residential district or public street. Bulbs <br />emitting in excess of 3,000 lumens (150 watts) shall be so directed that the bulb is not visible <br />from off of the property where such light source is located. <br />Parking: The City has requested a parking study to verify that the proposed 179 standards <br />and 7 handicapped parking stalls is sufficient. The Applicant is showing a separate area for <br />bus parking and has shown 22 bus parking stalls. All staging/stacking of busses is required to <br />be handled on site. <br />Development Fees: Development Fees will be due with the Site Plan including, but not <br />limited to, Park Dedication, Trail Development, and Stormwater Management. These fees are <br />collected at the time the Development Agreement is recorded and at the rate in effect when <br />the agreement is recorded. <br />Development Agreement: An executed Development Agreement for the site improvements <br />will be required prior to releasing the plat for recording. Staff will review the engineering <br />estimates once submitted by the Applicant. <br />
The URL can be used to link to this page
Your browser does not support the video tag.