My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 01/04/2018
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2018
>
Agenda - Planning Commission - 01/04/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:29:58 AM
Creation date
1/25/2018 9:11:03 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
01/04/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: Ramsey Elementary School <br />Site Plan Application <br />Engineering Review <br />December 21, 2017 <br />Page 5 of 6 <br />pond if the pond will be dry. The local soils are easily eroded and soils down slope of flared end <br />sections have eroded in the past, requiring extensive repairs. <br />The flow areas are identified as West, East and North. Our observations on each area will be <br />presented separately. <br />East area <br />This area includes two (2) existing wetlands near the eastern edge of the property. The wetlands <br />will not be impacted by the project. The outlet for Wetland 3 is 887.9. City analysis of the <br />topography east of the property indicates the grade rises to near 890 before dropping into a small <br />confined basin. <br />The adjacent plat, Shady Lawn Estates was recorded in 1972. Easements were taken along the <br />right-of-way only, not along side lot lines or back lot lines. There is no route for discharging <br />stormwater to the East. <br />This area will need further analysis and the proposed 100 year water level of pond W3 will need <br />to be revised. <br />North area <br />This area includes one (1) existing wetland near the northern edge of the property. The wetlands <br />will not impacted by the project. The outlet for Wetland 1 is listed as 890.5. City analysis of the <br />topography North of the property indicates the grade rises to near 891 before dropping into a the <br />Trott Brook valley. <br />The area to the north is not platted. There is no route for discharging stormwater to the North. <br />This area will need further analysis and the proposed 100 year water level of pond W 1 will need <br />to be revised. <br />West area <br />This area includes the new building and most of the new impervious surfaces. The LRRWMO <br />requirement is to infiltrate the first 1" of runoff from all new impervious surfaces. It appears that <br />all of the runoff is directed to the new pond. Ponding areas can serve as the infiltration basin as <br />long as the pond is completely dry within 48 hours after the 100 year event. The pond was <br />modeled as a wet pond, thus it cannot be used for infiltration credit if it retains water all the time. <br />This ponding area is also using the emergency overflow to pass part of the 100 year event. The <br />emergency overflow may not be used to pass part of the 100 year event. All of the 100 year event <br />must pass through the outlet piping. <br />
The URL can be used to link to this page
Your browser does not support the video tag.