Laserfiche WebLink
CITY OF RAMSEY LAND USE APPLICATION <br />TECHNICAL REVIEW FILE (REVISED JUNE 1, 2016) <br />DATE <br />DECEMBER <br />21, 2017 <br />PROJECT ADDRESS <br />WEST OF CENTER STREET <br />AND NORTH OF SUNWOOD <br />DRIVE <br />PROJECT. TITLE <br />SKETCH PLAN AND SITE PLAN REVIEW <br />ESCROW # <br />DEPARTMENT: <br />Engineering <br />TECHNICAL <br />REVIEWER• <br />Name: Leonard Linton <br />Phone: 763 433-9834 <br />Email: llinton@ci.ramsey.mn.us <br />The City is in receipt of a Sketch Plan application made by the Inland Group for their proposed <br />project, Affinity at Ramsey. The associated plans were prepared by Alliant Engineering, Kaas <br />Wilson Architects, Civil Site Group and BKBM and are dated December 6, 2017. We offer the <br />following comments: <br />General comments <br />Notes must only appear on one (1) sheet. <br />Text must not appear over other text or symbols. <br />Break lines under text. <br />Add notes to the plan set: <br />Hours of construction are 7:00 am to 10:00 pm. No equipment may be started before 7:00 am. <br />Site work on Saturday requires 72 hour advance notice for approval. Sunday work requires City <br />Council approval. Meetings are the 2'd and 4th Tuesdays. Requests must be submitted one week <br />before for inclusion on the agenda. <br />These notes are summaries of the comments added to each page in ProjecDox. <br />C0.0 <br />All sheets require a sheet specific legend with all linetypes and symbols used on that sheet. <br />Adjust title blocks to provide 4" x 4" space along the right edge for City stamps. <br />C0.1 <br />The topographic survey must extend 100 feet beyond the property boundary per City Code. The <br />proposed property line must also be shown. <br />Label the western most waterline in Center Street as RAW WATER. <br />