Laserfiche WebLink
10285 89th Ave. N • Maple Grove, MN 55369 <br />Ph. (763) 424-9191 • Fax (763) 424-9190 <br />ASPHALT & CONCRETE, INC. <br />Date: Tuesday, February 6, 2018 <br />Proposal # 2018-0279 <br />Submitted To: <br />Steve Fischer <br />Arrow Companies <br />7365 Kirkwood Court N. <br />Suite #335 <br />Maple Grove, MN 55369 <br />Contact Information: <br />Phone: (763) 424-6355 <br />Mobile: (612) 619-9991 <br />E-mail: sfischer@arrowcos.com <br />~Site Description: # S123759 <br />Commerical Building <br />6750 Highway 10 <br />Ramsey, MN 55303 <br />Site Contact: <br />Site Phone: <br />Site Email: <br />�Prepared By: <br />David Johnson <br />Contact Information: <br />Mobile: 612-251-7360 <br />Office: 763-424-9191 <br />E-mail: davidj@aciasphalt.com <br />Project Manager: <br />Lucas Chapman <br />Mobile: <br />Qty Proposed Service(s) & Description(s) <br />6,500 Sq. Ft. Construct New Parking Lot <br />Service Description <br />Salvage existing class-5 base (assuming 3 inches existing) <br />Excavate area 6 additional inches and remove material. <br />Reinstall salvaged class-5 and add 3 inches of new material, compact and grade. <br />Pave 1.5 inch base course (MV3) <br />Pave 1.5 inch wear course (MV4) <br />14,300 Sq. Ft. Construct New Parking Lot <br />Service Description <br />Salvage existing class-5 base (assuming 3 inches existing) <br />Excavate area 6 additional inches and remove material. <br />Reinstall salvaged class-5 and add 3 inches of new material, compact and grade. <br />Pave 1.5 inch base course (MV3) <br />Pave 1.5 inch wear course (MV4) <br />PAYMENT TERMS 0 Down, Balance Net 60 <br />Depth <br />$24,750.00 <br />$52,195.00 <br />Project Total: $76,945.00 <br />SERVICE TERMS Landscape restoration not included in scope of work unless specifically noted. ACI is not responsible for <br />damage to irrigation systems when not properly marked by client. Customer will be notified when work is to be performed. It is the <br />customer's responsibility to make sure the irriaation systems are shut off as to not cause damaae to the work performed. <br />This proposal may be withdrawn at our option if not accepted within days <br />of Feb 6, 2018 <br />Pavement Consultant David Johnson <br />Accepted Authorized Signature <br />9,401t,A.4.101/L- <br />Professional People, Progressive Solutions <br />www.aciasphalt.com <br />