Laserfiche WebLink
Central Anoka County Regional Trail <br />.. • <br />This master plan amendment addresses a segment of trail located in the City of Ramsey, as shown in <br />Figure 1 and 2. In 2017, the City of Ramsey requested the County to change the trail alignment from its <br />existing route along Ramsey Boulevard to align with Center Street, the Ramsey Northstar Station, a <br />proposed pedestrian overpass over Highway 10, and ultimately connect to Mississippi West Regional <br />Park, the Mississippi River and the Mississippi River Trail, a federally designated bike route (U.S. Bike <br />Route 45). In addition, the trail is proposed to connect to the Mississippi National River Recreation Area. <br />Proposed City of Ramsey Parks <br />Legend <br />PROPOSED R EALIGNMENT OF CENTRAL <br />- ANOKACOUNTY REGIONAL TRAIL, TRAIL <br />ALREADY EXISTING <br />PROPOSED R EALIGNMENT OF CENTRAL <br />ANOKA COUNTY REGIONAL TRAIL <br />EXI STING CENTRALANOKA COUNTY REGIONAL <br />TRAIL <br />- EXISTING REGIONAL TRAIL DESIGNATION TO <br />BE REMOVED <br />PLANNED REGIONAL TRAIL DESIGNATION TO <br />BE REMOVED <br />CURR ENT ISSISSI PR RIVER TRAIL <br />ALIGNN£NT <br />MISSISSIPPI RIVER REGIONAL TRAIL 2018 <br />CONSTRLICTON <br />I=I= RAILROAD <br />- ROADWAY <br />® TRANSIT STATION <br />PROPOSED CT( PARK <br />CITY PARK <br />CITY TRAIL <br />PARK TRAILS <br />REGIONAL PARK <br />Mississippi River <br />Mississippi West <br />Regional Park <br />Existing regional trail <br />designation proposed <br />to be removed from <br />Master Plan, once <br />-6 proposed trail <br />construction is <br />camplete. <br />co <br />ar <br />E <br />Proposed Changes to <br />Central Anoka County Regional Trail <br />0 1,300 2,600 Feet <br />Figure 2 <br />Date 01118I2018 <br />Boundaries and Acquisition <br />The majority of the proposed change to the Central Anoka County Regional Trail segment discussed in <br />this master plan amendment is already existing within the road right of way. Where the trail does not <br />currently exist, the City of Ramsey owns the right of way or has an easement for regional trail <br />purposes. The value of said easement is approximately $100,000. Prior to construction of the trail, a <br />. 3 <br />