Laserfiche WebLink
BOLTON <br />& MENK <br />Real People. Real solutions. <br />Environmental Documentation — Once the project is significantly funded the environmental <br />documentation should begin. We will perform the study so it can be incorporated into the <br />future EA/EAW. <br />Final Design and ROW Acquisition — Upon completion of the above tasks, right-of-way <br />acquisition and final design can begin. <br />Utility Coordination — Utility coordination should be completed in conjunction with the tasks <br />noted above. <br />20 <br />