My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Planning Commission - 02/01/2018
Ramsey
>
Public
>
Minutes
>
Planning Commission
>
2018
>
Minutes - Planning Commission - 02/01/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 3:01:50 PM
Creation date
3/13/2018 9:29:39 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Planning Commission
Document Date
02/01/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 1,2018 <br /> Page 2 <br /> receive deliveries of materials for the landscaping business,nor will it be used as a staging point <br /> for employees. <br /> The Plan <br /> In order to ensure full compliance with the ordinance, Mr. Longfield intends to do the following <br /> this spring: <br /> • Construct a 60' by 78' building at the very rear of my 8-acre property to store all <br /> landscaping equipment. The storage building will be masked from view by extensive tree <br /> coverage surrounding the property, and by a privacy fence around the rear portion of the <br /> property. It will not be possible to see the storage building from the public roadway, or <br /> from neighboring homes. <br /> • The storage building will be of sufficient size so that it can store all landscaping <br /> equipment, including the trucks and trailers entirely within the building, and allow for all <br /> loading and unloading of equipment entirely within the structure.No loading or <br /> unloading of equipment will need to occur outside of the storage building. <br /> • The building will have no exterior signage. <br /> • The building will be accessed by way of a crushed concrete driveway running from the <br /> road along the southern boundary of the property to the storage building. <br /> • The class-5 surface currently in place at the front of the property abutting the street will <br /> be removed and replaced by a paver or concrete driveway that will comply with City <br /> requirements. The class-5'surface remains in place there only to allow for access to the <br /> property by construction equipment necessary to build the storage building. <br /> Mr. Longfield's plan is depicted on the enclosed rendering and survey. <br /> Mr. Longfield looks forward to addressing these issues before the Planning Commission and <br /> City Council. Please provide this letter to the members of these bodies along with the enclosed <br /> supporting documentation. <br /> Regar <br /> Rob Shainess <br /> Attorney at Law <br /> rob@capstonelaw.com <br /> cc: Travis Longfield(by email) and Tim Gladhill (by email) <br /> Phone 612-548-1604//Fax 952-314-9616 120 South Sixth Street, Suite 1720 <br /> www.capstonelaw.com Minneapolis,MN 55402 <br />
The URL can be used to link to this page
Your browser does not support the video tag.