Laserfiche WebLink
Public Works Committee 5. 3. <br />Meeting Date: 03/20/2018 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Consider Recommendation to City Council Approving Bituminous Patching with 2018 Street Overlay <br />Improvements, Improvement Project #18-03 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to consider a recommendation to City Council approving bituminous patching with the <br />2018 Street Overlay Improvements, Improvement Project #18-03. <br />Background: <br />While preparing plans and specifications for Improvement Project #18-03, 2018 Street Overlay Improvements, <br />Staff reviewed the existing pavement conditions of impacted street segments in the field again and noted various <br />areas of pavement that are in extremely poor condition. These areas of severely damaged pavement should be <br />removed and replaced with new pavement before receiving an overlay to prevent the overlay improvements from <br />prematurely deteriorating before the end of its design life, which is roughly 20 years. <br />Staff is therefore preparing plans and specifications to include removal and replacement of the areas of damaged <br />bituminous pavement prior to overlaying. This work as proposed will increase project costs in impacted areas. <br />Unfortunately, this will also increase special assessment amounts in these areas, unless these costs were to be paid <br />100% by the City and not assessed to property owners. Per previous Council approvals, 25-percent of eligible <br />project costs are to be assessed against benefiting properties. <br />Attached are highlighted plan sheets showing all the areas proposed to receive bituminous patching prior to <br />overlaying. Staff will present information on the financial impacts to each of these project areas at the Public Works <br />Committee meeting. In order to present the best information available, Staff will incorporate updated bituminous <br />prices extracted from bids received on March 15. <br />The street segments proposed to receive bituminous pavement overlay improvements in 2018 are located in the <br />following developments: <br />• Northfork <br />• Northfork Oaks <br />• Northfork 2nd Addition <br />• Northfork 3rd Addition <br />• Northfork Itasca Shores <br />• The North Forty 2nd Addition <br />• The North Forty 3rd Addition <br />• Woodland Green <br />At the meeting, staff will present more detailed information associated with four options to address the increased <br />project costs as follows: <br />1. Overlay damaged areas as is — This option is not supported by Staff due to a high probability of premature <br />failure of overlay improvements over damaged areas. <br />2. Overlay damaged areas after patching with new pavement — This option is supported by Staff since it will <br />achieve the design life of the overlay improvements. <br />3. Reconstruct impacted street segments in 2019 — Staff could support this approach, but costs to reconstruct <br />