Laserfiche WebLink
City of Ramsey Local Water Supply Plan <br />System Component <br />Planned action <br />Anticipated <br />Construction <br />Year <br />Notes <br />Pressure Zones <br />❑X No action planned - adequate <br />❑ Repair/replacement <br />❑ Expansion/addition <br />Other: <br />❑X No action planned - adequate <br />❑ Repair/replacement <br />❑ Expansion/addition <br />Proposed Future Water Sources <br />Complete Table 13 to identify new water source installation planned over the next ten years. <br />Add rows to the table as needed. <br />Table 13. Proposed future installations/sources <br />Source <br />Installation <br />Location <br />(approximate) <br />Resource <br />Name <br />Proposed <br />Pumping <br />Capacity (gpm) <br />Planned <br />Installation Year <br />Planned <br />Partnerships <br />Groundwater <br />TBD <br />Tunnel City <br />Group <br />1500 <br />2020 <br />Surface Water <br />N/A <br />Interconnection <br />to another <br />supplier <br />N/A <br />Water Source Alternatives - Key Metropolitan Council Benchmark <br />Do you anticipate the need for alternative water sources in the next 10 years? Yes ❑ No ❑x <br />For metro communities, will you need alternative water sources by the year 2040? Yes ❑x <br />No ❑ <br />If you answered yes for either question, then complete table 14. If no, insert NA. <br />Complete Table 14 by checking the box next to alternative approaches that your community is <br />considering, including approximate locations (if known), the estimated amount of future <br />demand that could be met through the approach, the estimated timeframe to implement the <br />approach, potential partnerships, and the major benefits and challenges of the approach. Add <br />rows to the table as needed. <br />For communities in the seven -county Twin Cities metropolitan area, these alternatives should <br />include approaches the community is considering to meet projected 2040 water demand. <br />26 April 7, 2017 <br />