Laserfiche WebLink
City of <br />RAMF <br />Cur Mliilr}Im: To wort together ko respotibly grow our community, and to provide quality, cost-effecilve, and efficient government services. <br />CC Regular Session 7. 5. <br />Meeting Date: 03/27/2018 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title: <br />Adopt Resolution #18-058 Accepting Bids and Awarding Contract for River's Bend Streets Reconstruction, <br />Improvement Project #17-02 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #18-058 accepting bids and awarding a contract for construction for <br />River's Bend Street Reconstructions, Improvement Project #17-02. <br />Background: <br />Attached is a copy of the plans prepared by City staff for Improvement Project #17-02, River's Bend Street <br />Reconstructions. <br />This project proposes to reconstruct four street segments within the River's Bend residential neighborhood <br />including; <br />• 147th Lane from the west River's Bend plat line to Waco Street, <br />• 148th Avenue from the west River's Bend plat line to Xkimo Street, <br />• Xkimo Street between 147th Lane and 149th Avenue/Sunwood Drive, and <br />• Yakima Street between 148th Avenue and 149th Avenue/Sunwood Drive. <br />These street segments total approximately 2,774 feet in length as shown on the title sheet of the attached plans. <br />Proposed improvements include removing and replacing all damaged concrete curb and gutter sections, and <br />reconstructing the existing bituminous pavement section using the Full Depth Reclamation (FDR) process. The <br />existing storm sewer system is in good condition and generally meets City design standards. The only storm sewer <br />work proposed is resetting the castings after replacing adjusting rings and re -grouting the insides of the catch basins. <br />Municipal sanitary sewer and water utilities exist under each street segment. The attached plans do not propose <br />improvements to these utilities, except for casting adjustments. These utilities will be tested to verify they are in <br />good operating condition and should not require repairs during the serviceable life of these proposed improvements, <br />which is 60 years. If tests reveal repairs are necessary, such repairs would be completed separately before any work <br />on this project commences. <br />On February 12, 2018, Council accepted final plans and specifications and authorized advertisements for bids. On <br />March 15, 2018, nine (9) sealed bids were received and were publicly opened and read aloud. The bids were <br />checked for errors and omissions, and were tabulated. All bids were found to be competitive and favorable, <br />complied with the advertisement for bids, and two adjustments were required, those being to the bids of Omann <br />Contracting Companies, Inc. and Northwest Asphalt which will not impact awarding a bid since their bids were not <br />