Laserfiche WebLink
PAY ITEM NOTES: <br />1. REMOVAL LIMITS SHALL BE MARKED IN THE FIELD BY CITY STAFF. <br />EV TO CV CONVERSION FACTOR = 1.2. <br />ESTIMATED QUANTITY BASED ON APPLICATION RATE OF 0.07 GAL/SY. <br />ESTIMATED QUANTITY BASED ON APPLICATION RATE OF 110 LB/SY-IN. <br />0= vl < < <br />3= < <br />WCO <br />- ) \ <br />LU <br />/\ ?) <br />2z z/ } <br />c� \z ( <br />E) �& » <br />< ▪ 0 \< 0 <br />0z 21- <br />FC CC <br />0 <br />< }< \ <br />\ <br />§\ 0< _. <br />\/ W§ (\ <br />1= ▪ .\ \\ <br />\ � \� \\ <br />u( <0 /0 } <br />\\ =< rE <br />(2 <br />[\ _( e= <br />ze z- p[ <br />0 . = z3 <br />\»= \k 0< <br />gmw <br />+ LULU <z [ <br />(=2 \e 3w <br />zi- <br />z2z R, �u <br />z< e} <br />\\\ )� \ <br />GENERAL NOTES: <br />STATEMENT OF ESTIMATED QUANTITIES <br />17-02 RIVERS BEND STREET RECONSTRUCTIONS <br />PAGE ESTIMATED <br />MNDOT ITEM DESCRIPTION UNIT NOTE <br />NO. NO. NO. <br />180 <br />32 <br />70 <br />450 <br />300 <br />26 <br />28 <br />48 <br />556 <br />656 <br />4 <br />875 <br />230 <br />20 <br />68 <br />235 <br />5$ <br />»55(§\ <br />=5ul <br />» <br />5(/)))55555>>ggs(> <br />MOBILIZATION <br />REMOVE CONCRETE CURB AND GUTTER <br />REMOVE CONCRETE PAVEMENT <br />REMOVE BITUMINOUS PAVEMENT <br />REMOVE CONCRETE VALLEY GUTTER <br />SAWING CONCRETE PAVEMENT- FULL DEPTH <br />SAWING BITUMINOUS PAVEMENT - FULL DEPTH <br />COMMON EXCAVATION (EV) <br />SUBGRADE PREPARATION <br />WATER <br />BITUMINOUS PAVEMENT RECLAMATION (FULL -DEPTH) <br />MILL BITUMINOUS PAVEMENT (2' WIDTH X 1.5" DEPTH) <br />CURING COMPOUND FOR EXISTING CONCRETE CURB AND GUTTER <br />HAUL AND DISPOSE BIT PAVEMENT RECLAMATION (LV) <br />BITUMINOUS MATERIAL FOR TACK COAT <br />TYPE SP 9.5 WEARING COURSE MIXTURE (SPWEA340C) (1.5") <br />TYPE SP 12.5 NON -WEARING COURSE MIXTURE (SPNWB330C) (2.0") <br />TYPE SP 9.5 WEARING COURSE MIXTURE (SPWEA340C) DRIVEWAYS <br />(2.0") <br />ADJUST VALVE BOX <br />ADJUST FRAME AND RING CASTING <br />GROUT CATCH BASIN <br />CONCRETE CURB & GUTTER DESIGN SURMOUNTABLE <br />CONCRETE CURB & GUTTER DESIGN B618 <br />6" CONCRETE DRIVEWAY PAVEMENT <br />7" CONCRETE VALLEY GUTTER <br />LANDSCAPE RESTORATION <br />TRAFFIC CONTROL <br />STORM DRAIN INLET PROTECTION <br />STABILIZED CONSTRUCTION EXIT <br />COMMON TOPSOIL BORROW (LV) <br />SODDING TYPE LAWN <br />STATEMENT OF ESTIMATED QUANTITIES <br />