My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 04/05/2018
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2018
>
Agenda - Planning Commission - 04/05/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:30:48 AM
Creation date
4/2/2018 9:35:16 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
04/05/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
691
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 1, 2018 <br />Page 2 <br />receive deliveries of materials for the landscaping business, nor will it be used as a staging point <br />for employees. <br />The Plan <br />In order to ensure full compliance with the ordinance, Mr. Longfield intends to do the following <br />this spring: <br />• Construct a 60' by 78' building at the very rear of my 8-acre property to store all <br />landscaping equipment. The storage building will be masked from view by extensive tree <br />coverage surrounding the property, and by a privacy fence around the rear portion of the <br />property. It will not be possible to see the storage huilding from the public roadway, or <br />from neighboring homes. <br />• The storage building will be of sufficient size so that it can store all landscaping <br />equipment, including the trucks and trailers entirely within the building, and allow for all <br />loading and unloading of equipment entirely within the structure. No loading or <br />unloading of equipment will need to occur outside of the storage building.. <br />• The building will have no exterior signage. <br />• The building will be accessed by way of a crushed concrete driveway running from the <br />mad along the southern boundary of the property to the storage building. <br />• The class-5 surface currently in place at the front of the property abutting the street will <br />be removed and replaced by a paver or concrete driveway that will comply with City <br />requirements. The class-5. surface remains in place there only to allow for access to the <br />property by construction equipment necessary to build the storage building. <br />Mr. Longfield's plan is depicted on the enclosed rendering and survey. <br />Mr. Longfield looks forward to addressing these issues before the Planning Commission and <br />City Council. Please provide this letter to the members of these bodies along with the enclosed <br />supporting documentation. <br />Rob Sbainess <br />Attorney al Law <br />rob rr apstonelaw,com <br />cc: Travis Longfield (by email) and Tim Gladhill (by email) <br />Phone 612-548-1604 PI Fax 952-314-9616 120 South Sixth Street, Suite 3.72o <br />www.capstonelaw.com Minneapolis, MN 55402 <br />
The URL can be used to link to this page
Your browser does not support the video tag.