My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/24/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 04/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:50:45 PM
Creation date
4/19/2018 5:09:35 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/24/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
855
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: Rum River Prairie Final Plat Request <br />April 17, 2018 <br />Page 2 of 2 <br />Streets and Access. The Applicant is proposing to construct a new roadway shown as 169th Avenue as well <br />as constructing a cul-de-sac road shown as 169th Ct NW. Each of the proposed roadways are shown at a width <br />of 32 feet with a 66 foot right-of-way. Staff has provided Anoka County with the proposed development and <br />requested feedback regarding the intersection of Tiger Street NW and Armstrong Boulevard NW. <br />Landscaping: Details regarding the review of the landscaping and tree preservation plan will be provided in <br />a separate memo. <br />Trails. The Applicant has revised plans to show a trail corridor on the north/east side of Armstrong Boulevard <br />within the existing County Road right-of-way. The construction of the trail will require coordination with Anoka <br />County. Construction of the trail along Armstrong Boulevard within existing right of way is consistent with <br />previous sections of the trail. In some areas additional easement was required due to lot configuration; however, <br />given the extent of the existing right of way within the project area, additional easement has not been identified <br />by Staff as being necessary. <br />Grading and Drainage Plans. Please see Engineering Comments with regard to grading and drainage. Note <br />that a separate Review Memo from the Engineering Department will be provided as an addendum to this <br />review. <br />Development Fees. Development Fees will be due with the Plat including, but not limited to, Park Dedication, <br />Trail Development, and Stormwater Management. These fees are collected at the time the Final Plat is recorded <br />and at the rate in effect when the plat is recorded. <br />Development Agreement: An executed Development Agreement will be required prior to releasing the plat <br />for recording. <br />
The URL can be used to link to this page
Your browser does not support the video tag.