Laserfiche WebLink
Appendix A <br />Rolton & Menk Public Infrastructure Study: Section VII, Cost Considerations <br />2018 Cost Estimations by Road Segment <br />Improvement <br />Roadway <br />Trails/Sidewalks <br />Street Lighting <br />Storm Sewer <br />Trunk Storm Sewer <br />Watenn itl <br />Sanitary Sewer <br />Truk San Sewer <br />Total Costs <br />gment A-1 <br />$ 361,000 <br />$ 32.000 <br />$ 22,000 <br />$ 118,000 <br />$ 43,000 <br />$ 122,000 <br />$ 78,000 <br />$ 0 <br />776.000 <br />Prepared by: Balton & Menk, Iran. <br />Center Street Area ArialyI R1bi,114J2.9 <br />Sgtnent 13 <br />$ 150,000 <br />$ 35,000 <br />$ 13,000 <br />5 35,000 <br />$ 0 <br />5 57,000 <br />0 <br />0 <br />$ 290.000 <br />Page 6 of 7 <br />Segment C-1 <br />$ 171,000 <br />$ 75,000 <br />$ 17,000 <br />$ 43,000 <br />0 <br />$ 98,000 <br />$ 77.000 <br />0 <br />481.000 <br />Segment C-2 <br />$ 67,000 <br />$ 30,000 <br />$ 7,000 <br />$ 17,000 <br />0 <br />$ 38,000 <br />$ 31,000 <br />$ 0 <br />$ 190,000 <br />