My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/24/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 04/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:50:45 PM
Creation date
4/19/2018 5:09:35 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/24/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
855
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The wetlands have been delineated by the Inland Group to determine the current wetland boundaries. The <br />City is working with the developer and the Lower Rum River Watershed Management Organization to <br />determine the appropriate mitigation strategy for this location. <br />Segment Improvements <br />While there is a general understanding of the total public improvements required to serve the area, <br />sequencing of the improvements will allow for planning and fiscal responsibility. Our understanding of <br />the most likely individual segments to be developed initially are shown in Figure 2 in Appendix B, and <br />include: <br />• Segment A-1: <br />o Extension of Ramsey Parkway from Center Street NW to Xenolith Street NW. <br />• Taper the median from 47 ft wide to 20 ft wide (Figures 10 & 16). <br />• Include 6 ft sidewalks on each side of the new roadway. <br />o Extension of sanitary sewer, storm sewer and watermain. <br />• Segments A-2 and A-3: <br />o Extension of Ramsey Parkway from Xenolith Street NW to Zeolite Street NW. <br />• Extend the existing typical section from the east (Figures 11 & 16). <br />o Extension of sanitary sewer, storm sewer and watermain. <br />• Reroute existing 15-inch sanitary sewer to new alignment. <br />• Segment B: <br />o Extension of Center Street NW to Ramsey Parkway. <br />• Extend the existing typical section from the south (Figures 12 & 16). <br />o Extension of storm sewer as needed for roadway drainage. <br />• Segments Cl and C2: <br />o Construction of Xenolith Street NW from Sunwood Drive to Ramsey Parkway. <br />• 36-foot roadway with two 6-foot sidewalks on either side (Figures 13 & 17). <br />o Extension of sanitary sewer, storm sewer and watermain. <br />• Segments Dl. D2. D3 and D4: <br />o Construction of sidewalk and plantings along the north side of Sunwood Drive. <br />• Extend the existing boulevard layout used east of Sapphire Street NW (Figures 14 & 17). <br />o Extension of irrigation for planting areas. <br />• Segment E: <br />o Construction of Yolite Street NW from Sunwood Drive to Ramsey Parkway. <br />• 36-foot roadway with two 6-foot sidewalks on either side (Figures 15 & 17) <br />o Extension of watermain and storm sewer. <br />o Extension of storm sewer for regional pond outlet. <br />Estimated project costs for each segment were developed to allow for the City to plan for the sequenced <br />implementation of the improvements and are summarized later in this report. <br />Jurisdictional Authority/Approvals/Permits <br />As the project moves from the planning stages to design and construction, permits will be required from <br />various agencies. Understanding and planning for requirements associated with obtaining permits and <br />Prepared by: Bolton & Menk, Inc. COST ALLOCATION ALTERNATIVES <br />Center Street Area Analysis 1 R16.114924 Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.