Laserfiche WebLink
• As forecast, now that the city is a few months into the schematic design work for the parks, and the public <br />infrastructure study, civil engineering work (as described in the first attachment) will provide for a grading <br />plan for both parks, and the fill sand volume to be available for development sites in The COR—at the <br />time of mass grading of the regional storm pond and The Waterfront. Note: the scope of work within the civil <br />engineering includes $6,000 in soil borings to "add a level of certainty for the assumption that the soils to be <br />removed for the storm pond] can be used for structural foundations." <br />• The soil borings will assist future development by providing groundwater elevation information, which can <br />have an impact on building pad elevations, as well as the overall design of the regional storm water pond and <br />connecting storm sewer system. <br />Funding Source: <br />The funding for the civil engineering is recommended to come from the Park Trust Fund. It may be noted here, that <br />the estimated Park Dedication proceeds from the Inland/Affinity Living project is $386,750 <br />Recommendation: <br />Staff recommends approval of Bolton & Menk's proposal to perform civil engineering services, that will result in <br />the preliminary grading and drainage plan for the two remaining park spaces in The COR, at a not -to -exceed <br />amount of $30,080. <br />Action: <br />Motion to: Approve Bolton & Menk's proposal to perform the preliminary grading and drainage plan for the two <br />remaining park spaces in The COR, at a not -to -exceed amount of $30,080. <br />Civil Engineering Proposal <br />The COR 'systems' plan <br />COR Parks and Public Realm Plan <br />The COR Interim Dev Plan <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Bruce Westby Bruce Westby 04/18/2018 06:52 PM <br />Grant Riemer Grant Riemer 04/19/2018 08:14 AM <br />Kurt Ulrich Kurt Ulrich 04/19/2018 08:57 AM <br />Form Started By: Mark Riverblood Started On: 04/18/2018 11:16 AM <br />Final Approval Date: 04/19/2018 <br />