Laserfiche WebLink
Mr. Mark Riverblood <br />April 18, 2018 <br />Page 2 of 2 <br />• Review potential site constraints, submittal process requirements, and other project requirements <br />with the City and Landscape Architect. <br />• Attend meetings with Owner, Landscape Architect and applicable agencies as needed. <br />SEQUENCE OF IMPROVEMENTS <br />Based on our understanding of improvements currently being considered, design of the park related <br />improvements will need to be closely coordinated with other substantial work in the area. Our thoughts <br />related to proceeding with design work are as follows: <br />1. Complete the topographical survey work and geotechnical exploration work as described above. <br />2. Receive sketch drawings from the Landscape Architect and incorporate the concepts into the base <br />map created during the topographical surveying process. <br />3. Complete the preliminary grading and drainage plan based upon the schematic design of the park <br />features as prepared by the Landscape Architect. <br />4. Based on the park related grading plan, verify that the regional storm water pond can be <br />constructed to the volume and depth required for storm water purposes and also for parks related <br />needs. This task will also quantify the amount of suitable backfill material available for use in <br />other areas of The COR. We will also alert the City of any inconsistencies noted between the <br />proposed park related improvements and the proposed Affinity site improvements. <br />No further work would be performed until the regional pond is constructed, as the significant <br />disturbances related to pond construction are anticipated to greatly alter the conditions at the site. <br />After the regional pond is constructed, additional services would then be proposed, including: <br />Topographical verification surveys (based on pond construction), adjustments to the schematic design <br />which may be required due to pond construction, and final design services for the park related features. <br />SUMMARY OF FEES <br />We have prepared preliminary fee estimates based on our understanding of the work to be performed. <br />These fees could change based upon work associated with the concept preparation portion of the overall <br />work plan. We estimate the Civil related design fees will be as presented below: <br />Task Fees <br />Topographical Survey $ 5,400 <br />Geotechnical Exploration $ 6,000 <br />Schematic Design $ 18.680 <br />Not -To -Exceed Fees $ 30,080 <br />If there are any questions or concerns, please call me at (651) 968-7760. <br />Sincerely, <br />Bolton & Menk, Inc. <br />Kevin P. Kielb, P.E. <br />Project Manager <br />C:\Users\kevinki\Desktop\Riverblood Proposals\Ramsey COR Area Additional Analysis 04182018.docx <br />Bolton & Wok is an squat c parwnity env Layer. <br />