My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/24/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 04/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:50:45 PM
Creation date
4/19/2018 5:09:35 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/24/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
855
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 7. 8. <br />Meeting Date: 04/24/2018 <br />By: Mark Riverblood, Engineering/Public <br />Works <br />Information <br />Title: <br />Status Update on the Mississippi Skyway, and Authorization to Prepare a Grant Application to Metropolitan <br />Council for the Mississippi Skyway. <br />Purpose/Background: <br />The purpose of this case is to provide City Council with a summary update on the on -going Mississippi Skyway <br />project; and to receive authorization to prepare an application for approximately $3.7 million dollars in Federal <br />funding through Metropolitan Council's Regional Solicitation grant program, due July 13, 2018. (The total cost to <br />extend and complete the pedestrian bridge is approximately $4.5M + 12-15% for construction engineering.) <br />Since 2012, the City of Ramsey, with its regional partners, has made significant and progressive improvements on <br />many aspects of the pedestrian bridge planned for over Hwy 10. A summary includes: <br />• Receiving a $100,000 Transit Oriented Development grant —resulting in Preliminary Design. <br />• Completion of the Regional Mississippi River Trail —at the south touchdown point of the proposed bridge. <br />• Securing the 100' x 100' foot touchdown easement adjacent to Riverdale Drive —a contribution by a private <br />developer, with a value in excess of $100,000. <br />• Receipt of $490,000 in National Park Service funding —resulting in the development of Final Plans and <br />Specifications, making for a 'shovel -ready' project. <br />• Level 2 Layout approval by MnDOT and the official assignment of Bridge #02053 <br />• Removal of the overhead three phase power line between Riverdale Drive and Hwy #10, reducing the project <br />cost in excess of $235,000. <br />• * Realignment of the Central Anoka County Regional Trail (pending final approval by Met Council) to Center <br />Street, the Northstar rail station, and crossing Hwy 10 with the completed skyway. <br />* The following is the rationale for Anoka County initiating the realignment of the regional trail to the location of <br />the extension of the skyway: "Currently the City of Ramsey [and regional trail users] has limited access to the <br />Mississippi River and Mississippi West Regional Park because Highway 10 is a large barrier for bicycle and <br />pedestrian access. This amendment proposes to change the alignment of the Central Anoka County Regional Trail <br />within the City of Ramsey to better connect with local parks, trails, restaurants, businesses and transit, while still <br />providing a [safe] connection to the river and Mississippi West Regional Park." <br />Notification: <br />No public notification is required. <br />Observations/Alternatives: <br />
The URL can be used to link to this page
Your browser does not support the video tag.