Laserfiche WebLink
The draft preliminary bridge plans included in the report may <br />be advanced to a complete preliminary plan for review and <br />approval by the MnDOT Bridge Office Preliminary Plan Review <br />Unit. Upon approval of the preliminary plan, the final design <br />and plans may be prepared and reviewed per the Cooperative <br />Construction Agreement Process. <br />Preparation of funding applications and requests for letters of <br />support may begin at this time while other steps outlined above <br />are on -going. <br />11 II, . .° I' i II,. „ III <br />111 II.' p h Ili Ili L.. I,_ <br />II: ' 11 1 Rr I r r��•-- 1=` Ihl, , II_, ..I=L. ._ IAI n ra �����I, <br />I III' .I !,111�14',11�1 <i'dili <br />Appendix E, Figure 20 - Preferred Concept D View from TH 10 <br />g, s "iian IUlillllllillllllllll11111114Y <br />Appendix E, Figure 19 - Preferred Concept D View of helix structure from the south <br />Appendix E, Figure 18 - Preferred Concept D Bird's eye view <br />December 2014 <br />Mississippi Skyway OverTH10 Preliminary Engineering Report iv <br />