Laserfiche WebLink
Park and Recreation Commission <br />Meeting Date: 03/08/2018 <br />Submitted For: Mark Riverblood, Engineering/Public Works <br />By: MaryJo Warner, Engineering/Public Works <br />5. 4. <br />Information <br />Title: <br />Check in —Schematic Design Process for Municipal Plaza and the Water -Centric Park in The COR <br />Purpose/Background: <br />As the Commission may recall, a recommendation to proceed to the schematic design phase for two remaining park <br />ares in The COR occurred earlier, with City Council approving this project in December of 2017. As this process is <br />underway, the purpose of this case is to 'check -in' on the direction of this planning endeavor. <br />Notification: <br />Observations/Alternatives: <br />The several attachments include various aspects of background on the Municipal Plaza and the water -centric park <br />space, as well as the latest iteration of concept plans with programming elements depicted. Staff will go through the <br />key aspects of these at the meeting. <br />Funding Source: <br />This case does not require funding. <br />Recommendation: <br />Staff recommends a review of the attachments for a refresher on some of the prior public input on the parks spaces <br />in The COR. <br />Action: <br />Based upon discussion, provide staff feed -back on the direction of the planning for the park areas in The COR. <br />Public input <br />Public input continued <br />Concept plans <br />programming sketch <br />pond edge options <br />Municipal Plaza concept <br />Municipal Plaza drainage <br />Waterfront park concept <br />Waterfront park drainage <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />