Laserfiche WebLink
Park and Recreation Commission <br />Meeting Date: 04/12/2018 <br />By: Mark Riverblood, Engineering/Public <br />Works <br />5. 2. <br />Information <br />Title: <br />Recommend Park Dedication for Rum River Prairie <br />Purpose/Background: <br />The purpose of this case is to recommend Park Dedication and Trail Fees for a proposed twenty-five (25) lot, <br />detached single family residential subdivision located at the intersection of Armstrong Blvd and Tiger Street. The <br />Subject Property is zoned R-1 Residential (Rural Developing) and the lots would be serviced by private well and <br />septic services. <br />Notification: <br />Staff attempted to notify all Property Owners within 700 feet of the Subject Property at the time of the Sketch Plan <br />Review. <br />Observations/Alternatives: <br />Preliminary Plat approval of Rum River Prairie occurred earlier this spring with Final Plat approval anticipated as <br />soon as April24th, 2018. The proposed lots would be serviced by individual private utilities (well and septic). The <br />lots being proposed range in size from 1.37 acres to 3.7 acres in size with all but one of the lots being 2.5 acres or <br />greater in size. <br />The city's Park and Trail Plan does not show the need for park space in this area, therefore staff recommends that <br />both Park Dedication and Trail Fees be satisfied by a *cash payment. <br />Consistent with the longstanding policy of requiring developers to construct a trail on one side of any arterial or <br />collector street (municipal, county or state roadway), as basic infrastructure for their plat, this plat will be required <br />to construct a 10' bituminous trail along Armstrong Boulevard. Additionally, for this plat, it would make sense to <br />extend the trail beyond the plat to north to connect with 173rd Avenue. This beyond plat trail construction <br />(approximately 1,830') would be *credit eligible first against Trail Fees owed, and then if required against the Park <br />Dedication. <br />The development fees owed are as follows, based upon 25 new lots created (if Final Platted in 2018): Park <br />Dedication $75,000, Trail Fees, $25,000. <br />Funding Source: <br />All costs associated with processing the Application are the responsibility of the Developer. <br />Recommendation: <br />Staff recommends Park Dedication and Trail Fees consist of a cash payment for the anticipated 25 lots within the <br />proposed Rum River Prairie, and that the Development Agreement specify that credit eligible trail construction <br />occur beyond the plat in the ROW of Armstrong Boulevard, north approximately 1,830' feet to 173rd Avenue. . <br />Action: <br />