Laserfiche WebLink
Primary Project Elements <br />Fountain and open space <br />Welcoming edges, gateway to park <br />Shared street in commercial district <br />Forest walk to Lake Ramsey <br />Municipal Plaza <br />Basic assumptions that support Estimate of Potential Construction Costs: <br />• Total acres/square footage (approximate): 2 acres/87,120 square feet <br />Estimate based on park elements illustrated on Concept Studies: <br />1. pavement (1/2 of total park area) 43,560 x $15/square foot <br />2. plantings (1/2 of total park area) 43,560 x $12/square foot <br />3. stage area canopy (space frame/awning) <br />4. lighting 70 pedestrian scale fixtures x $5,000 each <br />5. furniture i.e. planter walls, benches, bike racks, receptacles, etc <br />6. signage including large monument, information, direction <br />7. water feature (decorative, interactive, sculptural) <br />8. excavation/grading 25,000 cubic yards x $3/cubic yard <br />9. stormwater (surface / below ground), utilities, infrastructure* <br />Subtotal <br />Contingency and Soft Costs <br />Illustrative Plan (Cunningham Group 2013) <br />$ 650,000 <br />$ 525,000 <br />$ 250,000 <br />$ 350,000 <br />$ 300,000 <br />$ 100,000 <br />$ 200,000 <br />$ 75,000 <br />$ 250,000 <br />$ 2,700,000 <br />$ 810,000 <br />TOTAL <br />*District systems approach vs. site by site. <br />$ 3,510,000 <br />or $ 40.29 per square foot <br />Public Realm Framework + Cost Evaluation <br />