My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 01/11/2018
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2018
>
Agenda - Parks and Recreation Commission - 01/11/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:44:05 PM
Creation date
5/3/2018 10:42:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
01/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Primary Project Elements <br />Bike trail and path <br />Planted, soft edges <br />Wading Pond and splash pad <br />Flex use pavilion <br />Pedestrian paths <br />Lake Ramsey Commons <br />Basic assumptions that support Estimate of Potential Construction Costs: <br />• Total acres/square footage for park area (approx.): 13.5 acres / 588,060 square feet <br />• Total acres/square footage for lake (surface area approx.): 6 acres / 261,360 square feet <br />Estimate based on park elements illustrated on Concept Studies: <br />1. concrete wading pond, overlook; $6/sf $130,800 <br />2. concrete bike trail and pedestrian path; $5/sf $ 270,000 <br />3. plantings — 200,000 square feet x $5/square foot $ 1,000,000 <br />4. lighting 70 pedestrian scale fixtures x $5,000 each $ 350,000 <br />5. furniture, signage and lighting $ 750,000 <br />6. splash pad play water feature (interactive, sculptural) $ 300,000 <br />7. entry plaza including pavement, sculpture $ 100,000 <br />8. fishing pier $ 30,000 <br />9. pavilion (flex use, picnic shelter, no rest rooms) $ 250,000 <br />10. excavation/grading 183,000 cubic yards x $3/cubic yard $ 540,000 <br />11. lake liner 300,000 square feet x $3.50/square foot $ 1,050,000 <br />12. stormwater (surface / below ground), utilities, infrastructure* $ 300,000 <br />Subtotal $ 4,710,800 <br />Contingency and Soft Costs $ 1,413,240 <br />TOTAL $ 6,224,040 <br />or $ 10.58 per square foot <br />*District systems approach vs. site by site. <br />Public Realm Framework + Cost Evaluation <br />
The URL can be used to link to this page
Your browser does not support the video tag.