Laserfiche WebLink
Public Works Committee 6. 1. <br />Meeting Date: 04/18/2018 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Staff Updates on Improvement Projects and Items of Interest <br />Purpose/Background: <br />The purpose of this case is to update the Public Works Committee on current and proposed improvement projects <br />within the City, and on other items of interest to the Committee. <br />City Improvement Projects <br />• Riverdale Drive Extension - Traprock St. to Ramsey Blvd. (#16-20) <br />• Construction is substantially complete <br />• Final completion will occur in 2018 <br />• Puma Street Utilities Extensions (#17-10) <br />• Construction is substantially complete <br />• Final completion will occur in 2018 <br />• The COR Regional Infiltration Basin (#18-09) <br />• Staff is preparing Plans & Specifications <br />• Soil borings have been ordered <br />• Considering placement of fill throughout The COR <br />• Construction will occur in 2018 <br />• Bunker Lake Boulevard and Puma Street Improvements (#18-05) <br />• Bolton & Menk is preparing final Plans & Specifications <br />• State Aid reviewed Plans & Specifications <br />• Council to consider approving plans and authorizing bids in May <br />• Construction anticipated to begin late June <br />• Final completion anticipated late August <br />Anoka County Improvement Projects <br />• Hanson Boulevard/CSAH 78 Reconstruction (2018) <br />• Expand CSAH 78 / Hanson Blvd between 139th Ave and CSAH 18 / Crosstown Blvd to 4-lane divided <br />section <br />• Foley Boulevard/CSAH 11 Grade Separation @ BNSF Railway Crossing <br />• This project is currently unscheduled and unfunded <br />MnDOT Improvement Projects <br />• Trunk Highway 10 Cable Median Barrier Installation (2018) <br />• Install cable median barrier along Highway 10 between Thurston Avenue and Highway 101 <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Railway Crossing (2017) <br />• Preliminary design on hold <br />• Exploring realignment of Highway 47 to remove S-curve at fair grounds <br />• Ramsey Staff will continue tracking this project <br />Items of Interest <br />9 <br />