My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 04/18/2018
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2018
>
Agenda - Public Works Committee - 04/18/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:17:15 AM
Creation date
5/3/2018 10:49:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
04/18/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Civil Engineer IV Linton explained that construction of the infiltration basin is necessary to <br />fulfill the City obligations incurred with LRRWMO approval of project in The COR since 2015 <br />and to provide capacity for future development to occur. He stated that the City has collected <br />infiltration mitigation funds from all developments in The COR since 2015 and those funds will <br />pay approximately 1/4 of the cost of the project. He noted that the City will pay for the remainder <br />of the project now and will be reimbursed as future development occurs. He recommended that <br />the Committee recommend that the City Council authorize preparation of a Feasibility Study for <br />The COR Infiltration Basin Improvement, Improvement Project #18-09. <br />Councilmember Kuzma referenced the remaining balance that would be owed, apart from the <br />funds that have been paid from developers and asked where those remaining funds would come <br />from. <br />City Engineer Westby replied that the funds would come from the storm water fund and <br />confirmed there are sufficient funds. <br />Councilmember Johns asked for details on future development and how those funds would be <br />paid to the City. <br />Civil Engineer IV Linton replied that The COR is unique because of the wellhead protection area <br />and therefore most of the future developers will pay into the infiltration mitigation fund. He <br />noted that a certain area of The COR (outside of the wellhead protection area) would provide <br />developers with the choice of whether to do their own stormwater management or to pay into the <br />infiltration mitigation fund. <br />Chairperson Riley asked for details on how this basin will look. <br />Civil Engineer IV Linton stated that the basin will be about four feet deep. He stated that a <br />requirement of the basin is that all water must infiltrate within 48 hours. He noted that selected <br />plantings must be resistant to short-term flooding. <br />Councilmember Johns asked if there would be landscaping. <br />City Engineer Westby stated that a landscaping plan has not been developed yet but costs for <br />vegetation are included in the estimate, including minimal landscaping. He replied that it will <br />likely look more like a natural prairie area. <br />Chairperson Riley asked if staff is being smart with the calculations for future developers to <br />ensure that the cost would cover long-term maintenance duties. <br />City Engineer Westby replied that the long-term maintenance would be covered through the <br />storm water maintenance program. He stated that staff will work with PSD on the acquisition of <br />easements and/or land, as needed. He stated that thus far, PSD has stated they would prefer to <br />deed the triangular piece of their property to the City. He noted that if this progresses forward, <br />staff would bring back an agreement with PSD with the plans. <br />Public Works Committee / March 20, 2018 <br />Page 3 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.