My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 05/03/2018
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2018
>
Agenda - Planning Commission - 05/03/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:30:54 AM
Creation date
5/3/2018 10:58:47 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
05/03/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
685
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Ramsey Local Water Supply Plan <br />Table 11. Status of Wellhead Protection and Surface Water Protection Plans <br />Plan Type Status Date Adopted Date for Update <br />WHP ❑ In Process August 11, 2009 August 2019 <br />❑X Completed <br />❑ Not Applicable <br />SWP ❑ In Process <br />❑ Completed <br />❑X Not Applicable <br />F. Capital Improvement Plan (CIP) <br />Please note that any wells that received approval under a ten-year permit, but that were not <br />built, are now expired and must submit a water appropriations permit. <br />Adequacy of Water Supply System <br />Complete Table 12 with information about the adequacy of wells and/or intakes, storage <br />facilities, treatment facilities, and distribution systems to sustain current and projected <br />demands. List planned capital improvements for any system components, in chronological <br />order. Communities in the seven -county Twin Cities metropolitan area should also include <br />information about plans through 2040. <br />The assessment can be the general status by category; it is not necessary to identify every <br />single well, storage facility, treatment facility, lift station, and mile of pipe. <br />Please attach your latest Capital Improvement Plan as Appendix 4. <br />Table 12. Adequacy of Water Supply System <br />System Component <br />Planned action <br />Anticipated Notes <br />Construction <br />Year <br />Wells/Intakes <br />Water Storage Facilities <br />Water Treatment Facilities <br />Distribution Systems <br />(pipes, valves, etc.) <br />❑ No action planned - adequate <br />❑ Repair/replacement <br />❑X Expansion/addition <br />❑X No action planned - adequate <br />❑ Repair/replacement <br />❑ Expansion/addition <br />❑X No action planned - adequate <br />❑ Repair/replacement <br />❑ Expansion/addition <br />❑ No action planned - adequate <br />❑ Repair/replacement <br />❑X Expansion/addition <br />2021 based <br />on current <br />demands and <br />future <br />projections <br />Based on <br />development <br />needs <br />25 April 7, 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.