Laserfiche WebLink
BMP Summary Sheet <br />MS4 Name: City of Ramsey <br />Minimum Control Measure: 3-Illicit Discharge Detection And Elimination <br />Unique BMP Identification Number: 3a-1 <br />*BMP Title: Storm Sewer System Map <br />*BMP Description: <br />The City of Ramsey will develop a Storm Sewer System Map that will assist us in determining the presence of <br />Illicit Discharges. The map will also aid in inspection of the storm sewer system and to prioritize the annual <br />maintenance required to optimize the use of the storm sewer system to reduce pollution in disharges to the waters <br />of the State. <br />Location(s) in SWPPP of detailed information relating to this BMP: <br />*Measurable Goals: <br />Completed Storm Sewer System Map <br />Identification of needed maintenance <br />*Timeline/Implementation Schedule: <br />December 2006 — Compilation of As -built information <br />December 2007 — Completion of Storm Sewer System Map <br />June 30, 2008 Storm Sewer System Map Completed <br />Annually — Update map with new projects and reconstruction <br />Specific Components and Notes: <br />*Responsible Party for this BMP: <br />Name: Leonard Linton <br />Department: Engineering <br />Phone: 763 427-1410 <br />E-mail: llinton@ci.ramsey.mn.us <br />*Indicates a REQUIRED field. Failure to complete any required field will result in rejection of the application due <br />to incompleteness. <br />Ramsey Minnesota SWPPP -30- May 2006 February 2009 <br />