Laserfiche WebLink
BMP Summary Sheet <br />MS4 Name: City of Ramsey <br />Minimum Control Measure: 4-Construction Site Stormwater Runoff Control <br />Unique BMP Identification Number: 4a-1 <br />*BMP Title: Ordinance or other Regulatory Mechanism <br />*BMP Description: <br />Construction Site Stormwater Runoff Control and Enforcement is addressed in section 9.27 of City Code and went <br />into effect on January 2, 2007. <br />Location(s) in SWPPP of detailed information relating to this BMP: <br />*Measurable Goals: <br />Adoption of Ordinance <br />*Timeline/Implementation Schedule: <br />June 2006 Adopt Ordinance <br />Ongoing - Work with builders to raise awareness of ordinance and enforce provisions of ordinance. <br />Specific Components and Notes: <br />Required Components in ordinance: <br />• Submittal of Erosion and Sediment Control plans by site Operators to MS4 <br />• Site Plan Review and Approval before construction <br />• Site operators maintain records on rainfall and inspections <br />• Regular inspections by site operators <br />• Specify requirements for dewatering or basin draining at site <br />• Specify requirements for BMP maintenance <br />• Specify controls for managing solid and hazardous wastes <br />• Specify requirements for permanent stormwater controls <br />• Specify requirements for perennial vegetative cover on exposed soils <br />• Compliance includes Verbal warnings, written warnings, stop -work orders, fines, forfeit of security bond <br />money and/or withholding of certificate of occupancy. <br />*Responsible Party for this BMP: <br />Name: Leonard Linton <br />Department: Engineering <br />Phone: 763 427-1410 <br />E-mail: llinton@ci.ramsey.mn.us <br />*Indicates a REQUIRED field. Failure to complete any required field will result in rejection of the application due <br />to incompleteness. <br />Ramsey Minnesota SWPPP -36- May 2006 February 2009 <br />