Laserfiche WebLink
BMP Summary Sheet <br />MS4 Name: City of Ramsey <br />Minimum Control Measure: 5-POST-CONSTRUCTION STORMWATER MANAGEMENT IN <br />NEW DEVELOPMENT AND REDEVELOPMENT <br />Unique BMP Identification Number: 5b-1 <br />*BMP Title: Regulatory Mechanism to Address Post Construction Runoff from New Development and <br />Redevelopment <br />*BMP Description: <br />Adoption of Post Construction Runoff Ordinance <br />The City of Ramsey will have a Post Construction Runoff Ordinance in place within 6 months of extension of <br />permit coverage. <br />Location(s) in SWPPP of detailed information relating to this BMP: <br />*Measurable Goals: <br />Evaluation of existing ordinance <br />Adoption of Ordinance <br />*Timeline/Implementation Schedule: <br />December 2008 — Evaluation of Ordinance <br />December 2009 — Adoption of Ordinance <br />Specific Components and Notes: <br />The City of Ramsey currently operates under a Subdivision Ordinance. The City will evaluate the BMPs and <br />existing ordinance to see that the provisions of the SWPPP are being accomplished and develop a Post Construction <br />Ordinance in the 5th year of the permit cycle. <br />*Responsible Party for this BMP: <br />Name: Leonard Linton <br />Department: Engineering <br />Phone: 763 427-1410 <br />E-mail: llinton@ci.ramsev.mn.us <br />*Indicates a REQUIRED field. Failure to complete any required field will result in rejection of the application due <br />to incompleteness. <br />Ramsey Minnesota SWPPP -43- May 2006 February 2009 <br />