Laserfiche WebLink
4. Stage I Improvements. The improvements, as stated in City Code Section 117-615 (b) <br />(1), the PERMITTEE is required to construct or install are as follows (unless <br />otherwise noted): <br />a. Trunk and lateral sanitary sewer (not required) <br />b. Trunk and lateral water main (not required) <br />c. Storm drainage facilities <br />d. Stormwater maintenance through ninety percent (90%) buildout <br />e. Streets <br />f. Concrete curb and gutter (not required) <br />g. Street traffic control signals (not required) <br />h. Lot grading (per building permit with stockpiling as shown on site grading plan) <br />i. Trail development <br />j. Sidewalks (not required) <br />k. Electricity (within one-fourth mile) <br />1. Phone (within one-fourth mile) <br />m. Natural gas (within one-fourth mile) <br />n. Boulevard seeding. <br />o. Water shut off boxes (not applicable) <br />p. Landscaping (installed at time of building permit) <br />(the "Stage I Improvements"). <br />The PERMITTEE agrees to construct the Stage I Improvements according to the <br />terms and conditions of this Agreement and in accordance with the Plans and the <br />City Code. Per City Code Section 117-615, the PERMITTEE shall provide the <br />CITY with a set of re -producible as -built plans in Computer Aided Drafting (CAD) <br />format upon completion of the Stage I Improvements and acceptance by the CITY. <br />As as -built plans are a required Stage I Improvement item per City Code Section <br />117-615, the CITY will not release the required Stage I Improvement Financial <br />Guarantee noted in paragraph #6 below until said as -built plans are provided to the <br />CITY. Additionally, the PERMITTEE agrees to provide to the CITY the plans in <br />CAD format prior to the commencement of construction of the Stage I <br />Improvements. <br />5. Lot Corner Staking. The PERMITTEE must install lot corner stakes at all lot corners. <br />6. Installation of the Stage I Improvements. The PERMITTEE shall obtain all necessary <br />permits from all governmental agencies before commencing construction of the Stage <br />I Improvements. The PERMITEE must provide the CITY with copies of all necessary <br />permits from other governmental agencies prior to or when the PERMITTEE applies <br />for a building permit to construct improvements on a lot within the Plat. Within thirty <br />(30) days after the completion and acceptance of the Stage I Improvements, the <br />PERMITTEE shall provide the CITY with a complete set of reproducible "As Built" <br />plans in CAD format for the Stage I Improvements. <br />