My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/22/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 05/22/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:51:37 PM
Creation date
5/21/2018 2:18:50 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/22/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />Fees Payable to the City <br />1 Park Dedication. The PERMITTEE is responsible for satisfying applicable Park <br />Dedication requirements. The 2018 Park Dedication Fee applicable to the Plat is <br />$3,000 per residential unit. PERMITTEE must pay a Park Dedication Fee of <br />$75,000.00). The PERMITTEE acknowledges that these fees are estimates. The <br />rate in effect when the Plat is recorded will be collected. <br />2. Trail Development Fees. The PERMITTEE requirements. The 2017 Trail <br />Development Fee applicable to the Plat is $1,000 per residential unit. <br />PERMITTEE must pay a Trail Development Fee of $25,000.00). The <br />PERMITTEE acknowledges that these fees are estimates. The rate in effect when <br />the Plat is recorded will be collected. <br />3. Trail Credit. The PERMITTEE intends to construct trail outside of the bounds of <br />the plat at the request of the CITY. The CITY will credit back to the PERMITTEE <br />the costs associated with the development and construction of that trail outside of <br />the bounds of the Final Plat. The PERMITTEE shall provide the CITY with <br />documentation of actual trail costs. <br />4. Sanitary Sewer Connection (Trunk) Fees. The PERMITTEE is not responsible <br />for satisfying applicable Sanitary Sewer Trunk Fee requirements. <br />5. Water Connection (Trunk) Fees. The PERMITTEE is not responsible for <br />satisfying applicable Water Trunk Fee requirements. <br />6. Sanitary Sewer Lateral Benefit Fees. The PERMITTEE is not responsible for <br />satisfying Sanitary Sewer Lateral Benefit Fees. <br />7 Water Lateral Benefit Fees. The PERMITTEE is not responsible for satisfying <br />Water Lateral Benefit Fees. <br />8. Stormwater Management Fee. The PERMITTEE is responsible for satisfying <br />applicable Stormwater Trunk Fee requirements. The 2018 Stormwater <br />Management Fee is $487 per residential unit. PERMITTEE must pay a <br />Stormwater Management Fee of $12,175.00). The PERMITTEE acknowledges <br />that these fees are estimates. The rate in effect when the Plat is recorded will be <br />collected. <br />9. Street Light Fee. The PERMITTEE is not responsible for satisfying Street Light <br />Fees. <br />10. Street Light Operation and Maintenance Fee. The PERMITTEE is not responsible <br />for satisfying Street Light Operation and Maintenance Fees. <br />
The URL can be used to link to this page
Your browser does not support the video tag.