Laserfiche WebLink
- Pedestrian Ramps within the City ROW required a site specific layout which follows the MnDOT 6 <br />Sheets. These layouts must have spot elevations at the top of ramps, corners of landing areas, BOC at <br />full curb height and 0" curb height locations. Call out radius of BOC, use radial truncated domes <br />whenever possible. Landing area must be clearly identified. Details must be scaled and location and/or <br />ID by plan. <br />CSG RESPONSE: To be completed after street and utility alignments are approved in this <br />submittal. <br />Sheet SW1.0 <br />- Where is the work going off the sheet, this must be included in the plans. If a separate sheet is used a <br />matchline and call out sheet sheet number <br />CSG RESPONSE: Match line added to Sheet C3.1 and SW1.0 <br />Sheet SW1.1 <br />- Show additional work going off page <br />CSG RESPONSE: Match line added to Sheet C3.1 and SW1.1 <br />Sheet SW1.3 <br />- Weekly inspection logs and after every 0.5" rainfall event must be submitted to City Inspector. The <br />entire history must be submitted to City prior to final acceptance. <br />CSG RESPONSE: Note revised on sheet SW1.3 <br />- Did not see any information regarding the NOT. The NOT must be provided to the City for review prior <br />to submittal. <br />CSG RESPONSE: Adequate info on the notice of termination nature and timing being provided. <br />Additional language added regarding city submittal of the N.O.T. <br />4931 West 35th Street • Suite 200 • St. Louis Park • Minnesota 55416 www.civilsitegroup.com <br />Matt Pavek, PE • 763-213-3944 Patrick Sarver, PLA 952-250-2003 <br />