Laserfiche WebLink
Public Works - Space Comparison <br />Municipality <br />Population (2013) <br />Red Wing 16,513 <br />Willmar 19,680 <br />Northfield 20,581 <br />Golden Valley 20,845 <br />Farmington 22,167 <br />Crystal 22,588 <br />Elk River 23,447 <br />Prior Lake 24,408 <br />Chanhassen 24,432 <br />White Bear Lake 24,555 <br />Austin 24,763 <br />Savage 28,639 <br />Andover 31,709 <br />Cottage Grove 35,339 <br />Shakopee 39,167 <br />Average 25,256 <br />MEM <br />Site Size (acres) <br />Facility Size (gsf)1 <br />41.19 8.03 57,310 <br />15.95 16.96 68,600 <br />8.61 10.82 52,400 <br />10.55 1.68 54,400 <br />14.94 6.76 44,970 <br />5.88 5.30 63,000 <br />43.82 17.47 83,244 <br />18.33 11.40 48,453 <br />22.88 7.52 85,250 <br />8.66 4.23 55,259 <br />10.84 14.04 68,960 <br />16.45 14.51 66,600 <br />34.83 14.99 86,680 <br />37.48 11.27 63,922 <br />29.32 12.52 69,000 <br />21.32 10.50 64,537 <br />Ramsey (Existing) 24,935 29.79 7.74 32,000 <br />(Proposed GSF) 11.59 66,205 <br />General Notes: <br />1. Facility size does not include area for granular storage buildings. <br />V. Facility Comparisons <br />Notes <br />Built in 2015, $12.8M <br />Fleet 44,144 sf, Mechanics 13,300 sf, Shops 18,400 sf, Office 7,400 sf <br />29,000 sf addition in 2012 <br />Size reflects 2015 needs assessment, current size is 43,680 sf <br />END OF SECTION <br />V.2 I Ramsey Public Works Study - Comm. No. 1937.02 <br />BKV <br />GROUP <br />